Notice of Determination – Caltrans / PCTPA – September 2016
Final Environmental Impact Report (EIR)/Environmental Assessment (EA) – Caltrans / PCTPA – September 2016 [Volume 1 – 26MB] – [Volume 2 – 18MB]
Final Project Report – Caltrans/PCTPA – August 2016
Notice of Availability – Caltrans / PCTPA – August 2015
Draft Environmental Impact Report (EIR)/Environmental Assessment (EA) – Caltrans / PCTPA – July 2015 [Full Report – 33MB]
Cover, Summary, and Table of Contents
2.4 – Utilities/Emergency Services
2.5 – Traffic and Transportation/Pedestrian and Bicycle Facilities
2.8 – Hydrology and Floodplain
2.10 – Geology/Soils/Seismic/Topography
2.17 – Wetlands and Other Waters
2.20 – Threatened and Endangered Species
Chapter 3 – California Environmental Quality Act (CEQA) Evaluation
Chapter 4 – Comments and Coordination
Draft Project Report – Caltrans/PCTPA – July 2015
Attachment B – Constraints Map
Attachment C – Transportation Analysis Reports
Attachment D – Viable Alternatives Exhibits
Attachment E – Advance Planning Studies
Attachment F – Preliminary Cost Estimates
Attachment G – Exceptions to Design Standards
Attachment H – 2040 Planned Projects
Attachment I – Initial Site Assessment
Attachment L – Draft Environmental Document
Attachment M – Transportation Management Plan, Phase 1 Exhibit, Phase 1 Analysis Memo
Attachment N – Draft Stormwater Data Report
Attachment O –Landscape Architecture Assessment Sheet
Draft EIR/EA and Draft Project Report Supporting Technical Studies
Community Impact Assessment – ICF International – 2014
Traffic Analysis Report – Fehr & Peers – 2014
Visual Impact Assessment – ICF International – 2014
Historic Property Survey Report, Including Archaeological Survey Report, Historical Resources Evaluation Report, Extended Phase I Report, and Archaeological Evaluation Report (Phase II) – ICF International – 2014 and 2015
Resources Evaluated Relative to the Requirements of Section 4(f) – ICF International – 2014
Bridge Design and Location Hydraulic Study – WRECO – 2015
Drainage Impact Summary – WRECO – 2015
Stormwater Data Report – WRECO – 2014
Water Quality Assessment Report – WRECO – 2015
Structures Preliminary Geotechnical Report – Blackburn Consulting – 2014
Initial Site Assessment Update – Blackburn Consulting – 2014
Air Quality Study Report – ICF International – 2014
Air Quality Conformity Analysis – ICF International – 2014
Noise Study Report – ICF International – 2014
Noise Abatement Decision Report – ICF International – 2014
Natural Environment Study Including Preliminary Wetland Delineation Report and Fish Passage Reconnaissance Assessment – ICF International – 2014
Other Project Documents
Project Alternatives Flyer – PCTPA – February 2014
Project Concepts Flyer – PCTPA – January 2012
Project Study Report (PSR) for I-80 / SR 65 Interchange Modification – Caltrans – June 2009