Project Documents


Notice of Determination
 – Caltrans / PCTPA – September 2016

Final Environmental Impact Report (EIR)/Environmental Assessment (EA) – Caltrans / PCTPA – September 2016 [Volume 1 – 26MB] – [Volume 2 – 18MB

Final Project Report – Caltrans/PCTPA – August 2016

Notice of Availability – Caltrans / PCTPA – August 2015

 

Draft Environmental Impact Report (EIR)/Environmental Assessment (EA) – Caltrans / PCTPA – July 2015 [Full Report – 33MB]

Cover, Summary, and Table of Contents

Chapter 1 –   Proposed Project

Chapter 2 – Affected Environment, Environmental Consequences, and Avoidance, Minimization, and/or Mitigation Measures

2.1 – Land Use

2.2 – Growth

2.3 – Community Impacts

2.4 – Utilities/Emergency Services

2.5 – Traffic and Transportation/Pedestrian and Bicycle Facilities

2.6 – Visual/Aesthetics

2.7 – Cultural Resources

2.8 – Hydrology and Floodplain

2.9 – Water Quality

2.10 – Geology/Soils/Seismic/Topography

2.11 – Paleontology

2.12 – Hazardous Waste

2.13 – Air Quality

2.14 – Noise and Vibration

2.15 – Energy

2.16 – Natural Communities

2.17 – Wetlands and Other Waters

2.18 – Plant Species

2.19  – Animal Species

2.20 – Threatened and Endangered Species

2.21 – Invasive Species

2.22 – Cumulative Impacts

Chapter 3 – California Environmental Quality Act (CEQA) Evaluation

Chapter 4 – Comments and Coordination

Chapter 5 – List of Preparers

Chapter 6 – Distribution List

Appendices

 

Draft Project Report – Caltrans/PCTPA – July 2015

Draft Project Report

Attachment A – Location Map

Attachment B – Constraints Map

Attachment C – Transportation Analysis Reports

Attachment D – Viable Alternatives Exhibits

Attachment E – Advance Planning Studies

Attachment F – Preliminary Cost Estimates

Attachment G – Exceptions to Design Standards

Attachment H – 2040 Planned Projects

Attachment I – Initial Site Assessment

Attachment J – Value Analysis

Attachment K – Right of Way

Attachment L – Draft Environmental Document

Attachment M – Transportation Management Plan, Phase 1 Exhibit, Phase 1 Analysis Memo

Attachment N – Draft Stormwater Data Report

Attachment O –Landscape Architecture Assessment Sheet

Attachment P – Risk Register

 

Draft EIR/EA and Draft Project Report Supporting Technical Studies

Community Impact Assessment – ICF International – 2014

Traffic Analysis Report – Fehr & Peers – 2014

Visual Impact Assessment – ICF International – 2014

Historic Property Survey Report, Including Archaeological Survey Report, Historical Resources Evaluation Report, Extended Phase I Report, and Archaeological Evaluation Report (Phase II) – ICF International – 2014 and 2015

Resources Evaluated Relative to the Requirements of Section 4(f) – ICF International – 2014

Bridge Design and Location Hydraulic Study – WRECO – 2015

Drainage Impact Summary – WRECO – 2015

Stormwater Data Report – WRECO – 2014

Water Quality Assessment Report – WRECO – 2015

Structures Preliminary Geotechnical Report – Blackburn Consulting – 2014

Initial Site Assessment Update – Blackburn Consulting – 2014

Air Quality Study Report – ICF International – 2014

Air Quality Conformity Analysis – ICF International – 2014

Noise Study Report – ICF International – 2014

Noise Abatement Decision Report – ICF International – 2014

Natural Environment Study Including Preliminary Wetland Delineation Report and Fish Passage Reconnaissance Assessment – ICF International – 2014

 

Other Project Documents

Project Alternatives Flyer – PCTPA – February 2014

Project Concepts Flyer – PCTPA – January 2012

Project Study Report (PSR) for I-80 / SR 65 Interchange Modification – Caltrans – June 2009

Comments are closed.